Kitchen and Bath Remodeling in Kirkland, WA

A mid-range kitchen remodel in Kirkland costs $65,000 to $125,000 and a primary bathroom $65,000 to $115,000. Kirkland remodels often have a goal beyond new finishes: turning a kitchen toward the lake view, or opening up a split-level whose main floor was divided into small rooms.

Kitchen & Bath Remodeling inSeattleBellevueKirklandRedmond
A kitchen with dark lower cabinets, white tile and open wood shelvesOpen shelving
A bathroom with a tiled walk-in shower, two sinks and a wood vanityShower and vanity
A white kitchen with an L-shaped counter under a long windowKitchen counters

Kirkland kitchen and bath costs

ProjectTypical Kirkland rangeKirkland factors
Split-level kitchen opened up$85,000 – $160,000Bearing walls at the half-level
Lakeside kitchen reoriented to the view$100,000 – $200,000Windows, layout, structure
1990s subdivision kitchen update$60,000 – $110,000Same layout, new everything
Hall bathroom$36,000 – $62,000Builder-grade fiberglass tubs
Primary bathroom$65,000 – $115,000Walk-in showers replacing garden tubs

Kirkland kitchens and baths by house type

Split-levels in Juanita, Finn Hill and Highlands have small kitchens on a half-level with short bearing walls. Opening them to the living room usually needs a beam and careful engineering.

Lakeside homes in Houghton and Lakeview often had kitchens built at the back of the house, away from the view. Moving or opening them to face the lake changes windows and layout, which raises cost but transforms the house.

1990s subdivision homes in Kingsgate, Rose Hill and Totem Lake have kitchens with dated cabinets and laminate, and primary baths with large garden tubs few owners use. Replacing the tub with a large walk-in shower is the most common bathroom change.

Older cottages need systems updates along with the remodel.

What Kirkland houses hide

Mid-century houses may have galvanized pipe and ungrounded wiring. Some houses from the late 1970s to mid-1990s were plumbed with polybutylene supply pipe, which is prone to failure and is commonly replaced during remodels. Pre-1978 houses need lead-safe practices, and older materials may need an asbestos survey before demolition.

Kirkland kitchen and bath permits

Wall removals, plumbing moves, new circuits and window changes need building and trade permits through MyBuildingPermit. Replacing cabinets and fixtures in place generally does not.

Kirkland kitchen and bath questions

Can I move my kitchen to face the lake?

Usually, with plumbing rerouted and windows enlarged. It is one of the highest-impact remodels in lakeside Kirkland.

Should I replace polybutylene pipe during a remodel?

If your house has it, yes. Walls are open, and it is a known failure risk.

Is removing the garden tub a good idea?

For most owners, yes. A large shower is used daily; the tub rarely is. Keep a tub elsewhere if the house has young children.

How long does a split-level kitchen remodel take?

Eight to fourteen weeks on site, plus design and permit time.