Do I Need a Permit for My Project?

In Seattle, Bellevue, Kirkland and Redmond, a building permit is required for most work that changes structure, adds floor area, raises a deck more than 30 inches above the ground, or adds or moves plumbing and wiring; most painting, like-for-like repairs and short fences do not need one. This checker applies those rules to your project in your city and links you to the city's own page.

A surveyor in a hard hat looking through a level on a tripodSurveying
A set of building plans spread across a wooden tablePlan set
A house under construction with its framing and windows in placeNew construction

Rules that apply almost everywhere here

These four cities build on the International Residential Code as adopted by Washington, so the common exemptions are the same:

  • Fences up to 7 feet tall generally need no building permit, though zoning height limits still apply.
  • Decks no more than 30 inches above grade, under 200 square feet, not attached to the house and not serving a required exit door are generally exempt.
  • Painting, finish flooring, cabinets and countertops generally need no permit.
  • Anything that adds floor area, changes structure, or adds or moves plumbing, gas or electrical work needs one, and the trades pull their own permits for their part.

Where the cities differ

TopicSeattleBellevueKirklandRedmond
Application systemSeattle Services PortalMyBuildingPermitMyBuildingPermitMyBuildingPermit
Tree reviewProtects large and exceptional trees citywideSignificant trees protected; retention required with developmentDetailed tree retention rules on most lotsSignificant trees protected; replacement required
Steep slopesEnvironmentally critical areas, common on hillside neighborhoodsSteep slope and landslide areas on southern and eastern hillsLakeward slopes and Finn Hill ravinesEdges of Education Hill and the Lake Sammamish shore
WaterShoreline rules on lakes, Puget Sound and the Ship CanalLake Washington and Lake Sammamish shoreline; Kelsey and Coal creeksLake Washington shoreline; Juanita BayBear Creek, Evans Creek and the Sammamish River

Lead paint and asbestos on older houses

Houses built before 1978 may have lead paint. Under Washington's lead renovation rules, contractors who disturb painted surfaces in those houses must be certified and follow lead-safe work practices. Separately, the Puget Sound Clean Air Agency requires an asbestos survey before many renovation and demolition projects; older siding, roofing, flooring and duct wrap are common sources. Neither is a city building permit, but both affect how and by whom the work can be done.

Questions about permits

Who pulls the permit, me or the contractor?

Either can, but the contractor usually does, and should for any work they perform. A contractor who asks you to pull the permit in your name for their work is shifting responsibility to you.

What happens if work was done without a permit?

It tends to surface at sale, during an insurance claim or when a later permit brings an inspector in. The fix is a permit after the fact, which can mean opening finished walls for inspection.

Does my HOA approval count?

No. HOA approval and a city permit are separate, and a project may need both.