How to Compare Roofing Quotes

Three roofing quotes for the same Seattle-area house often differ by $5,000 to $15,000, and the difference is rarely about who is cheaper. Usually each roofer is pricing a different roof: different underlayment, different flashing, different ventilation, different assumptions about what is under the old shingles. Comparing quotes means first making them describe the same job.

Standing-seam metal roof planes meeting at a ridgeStanding seam
Stacked rows of split wooden roof shakesWood shakes
A white house with a green metal roof and a tree in frontMetal roof

Step 1: Give every roofer the same brief

Before anyone measures, decide what you want and say the same thing to each:

  • The roofing material and product line you are considering, or ask each to recommend one and explain why.
  • Whether you want gutters, skylights or chimney flashing included.
  • Whether you want attic ventilation evaluated and improved.
  • Your timeline and any HOA color requirements.

Ask each roofer to itemize their quote rather than give one number.

Step 2: Line up the scope

Put the quotes side by side in a simple table with these rows:

Line itemWhat to look for
Tear-offNumber of layers included; disposal included
Sheathing repairPrice per sheet; estimated sheets; how you approve extras
Skip sheathingWhether new decking over spaced boards is included on older houses
UnderlaymentSynthetic or felt; brand; full-roof ice and water shield or only at eaves and valleys
Drip edgeIncluded at eaves and rakes
FlashingNew step and counter flashing at walls and chimneys, or reused
ValleysOpen metal or closed-cut shingles
VentilationRidge vent, soffit vents, removal of old box vents, bathroom fan terminations
Shingle productManufacturer, line, color, wind rating
Pipe boots and ventsNew
SkylightsReflashed, replaced or excluded
GuttersIncluded, replaced or excluded
PermitWho pulls it, if one is needed
CleanupMagnetic nail sweep, protection of landscaping
WarrantyManufacturer material warranty and roofer workmanship warranty, each with length

Once the rows are filled in, the totals usually make sense. A low quote missing new flashing, ventilation or a sheathing allowance is not cheaper; it is less roof.

Step 3: Understand the unknowns

Every reroof has one big unknown: the condition of the deck under the old roof. Honest quotes handle it in one of two ways:

  • An allowance, such as "includes up to five sheets of replacement sheathing," with a price per additional sheet.
  • A unit price only, such as "$85 per sheet as needed," which keeps the base price lower but leaves the final cost open.

Neither is wrong. What matters is that the per-sheet price is reasonable and that you are shown damaged areas before they are covered. On houses built before about 1950, ask specifically about skip sheathing, which can add a few thousand dollars if it was not in the quote.

Step 4: Ask the same questions of each roofer

  1. Are your installers employees or subcontractors? Who supervises on site?
  2. Are you certified by the shingle manufacturer, and does that change the warranty I get?
  3. What ventilation does my attic have now, and what do you recommend?
  4. How do you handle flashing at the walls and chimney: new or reused?
  5. What happens if you find rot or skip sheathing?
  6. How many days will the job take, and how do you protect an open roof if rain comes?
  7. What does your workmanship warranty cover, and for how long?
  8. Will you pull a permit, and if not, why not?

Write the answers next to each quote. Vague answers on flashing and ventilation are as telling as the price.

Step 5: Check the company

  • Search each company on Washington's L&I "Verify a Contractor" tool: registration, bond, insurance and any claims.
  • Look for a local address and a history of work in your area.
  • Read reviews for patterns, especially about cleanup, communication and how problems were handled.
  • Ask for addresses of two recent roofs nearby that you can look at from the street.

Step 6: Watch the payment terms

A deposit to order materials is normal. A payment schedule that asks for most of the price before work starts is not. Final payment should follow completion and your walk-around with the roofer. On larger jobs, ask for lien releases from the supplier with your payments.

Red flags when comparing roofing quotes

  • A single number with no itemization.
  • "Overlay" offered on a roof that already has two layers.
  • No sheathing allowance or per-sheet price.
  • Reused flashing on a full replacement.
  • High-pressure pricing that expires the same day.
  • Door-to-door crews appearing after a windstorm with no local office.

Choosing

After lining up scope and answers, the choice usually narrows to two roofers. Choose the one whose quote is most complete and whose answers were clearest, then use the comparison table to ask the other to explain any remaining gap. Paying a little more for full flashing replacement, real ventilation and a strong workmanship warranty is almost always cheaper than a second roof job ten years early.